The shaft construction process would require a large crane or milling machine for the slurry panel excavation or panel excavator if cutter soil mix panels were […]
DCA may consider on-site acoustical surveys near potential construction sites to develop site-specific noise reduction methods. These types of surveys would not be conducted until specific […]
There are many places in the world where tunnels with similar features referenced have been constructed or are under construction, including tunnels at the Port of […]
The potential tunnel alignments and shaft locations in the Central and Eastern Corridor are still being developed. At this time, it appears that two tunnel launch […]
Excavated soils, with or without peat, would need to be managed on-site to prevent particulate matter, including dust and peat material, from leaving the construction site […]
In July 2017, DWR approved a conveyance project in the Delta involving two tunnels referred to as “California WaterFix.” In his State of the State address […]
Reclamation districts (RDs) have important requirements for maintenance, monitoring and flood fighting. These efforts will need to continue during construction and operation of the Delta Conveyance […]
The dewatering water would be tested to determine if on-site treatment would be required prior to reuse or removal from the site. The treatment could range […]