The NOP described the project with a capacity of 6,000 cubic feet per second (cfs) with a possible range in capacities of 3,000 to 7,500 cfs. At this time, DCA is considering tunnel sizing design criteria for gravity flow from the intakes to the pumping plant near the Southern Forebay. DCA is not considering design criteria for pressurized flow in the tunnel.