Home > FAQs > Is it possible to incorporate a riparian zone into the design of an intake facility, and would that be easier with the cylindrical tee screen or vertical flat plate type?
How will this facility be ensured to not kill Delta smelt, as has been reported to be happening at Clifton Court Forebay?
June 15, 2020
Will there be real-time disclosure with water quality issues found during construction?
June 15, 2020